| Owner: Center Coal Company - Center, ND |
|
Manager: Glen Baranko
|
|
|
| Completion: September 2006 |
|
Design, procure, manufacture and install new secondary crushing and conveying system in coal mine. Consisting of 4048 impactor crusher, 8'x16' 2deck screen, new primary support structure, 30"x120' silo feed conveyor, 30"x204' bin feed conveyor |
| Owner: Wyoming Lime Company - Frannie, WY |
|
Manager: Randy Banning
|
|
|
| Completion: November 2006 |
|
Design, procure, manufacture and install new coal bowl crusher and building at lime kiln. Consisting of metal building addition, weigh conveyors, concrete footings walls and pads, crane beam, exhauster piping |
| Owner: Hecla Mining Company - Coeur d'Alene, ID |
|
Manager: Dale Dean
|
|
|
| Completion: November 2005 |
|
Design, procure, manufacture and install new secondary crushing & screening system for zinc/lead mine. Consisting of 3' cone crusher, 5'x12' 3deck screen, crusher & screen support structures, cone feed & cone discharge conveyors, Metal buildings around screen structure and crusher, enclosed conveyor galleys with walkways, new thickener tank building |
| Owner: Thunder Basin Coal Mine - Wright, WY |
|
Manager: Gordon Shinkle
|
|
|
| Completion: May 2006 |
|
Design, procure, manufacture and install new soda ash system at coal mine. Consisting of 3200cuft silo, discharge augar, weigh augar system, concrete pad |
| Owner: Balzer Pacific Equipment - Portland, OR |
|
Manager: Mark Simmons
|
|
|
| Completion: May 2006 |
|
Design, procure and manufacture new apronpan chain feeder for gypsum plant. Consisting of 54"x70' 2chain apron pan chain feeder, 48"x70' dribble conveyor, support structure, loader dump hopper, walkways, handrails, access stairs |
| Owner: Montana Limestone Company - Warren, MT |
|
Manager: Dean Bray
|
|
|
| Completion: March 2004 |
|
Design, procure, manufacture and install primary crusher modification. Consisting of apron pan chain feeder, truck dump hopper, 5'x16' 2deck scalper screen, screen & jaw crusher support structure, 36"x132' jaw discharge conveyor |
| Owner: Minera Hecla Venezolana - Venezuela |
|
Manager: Dale Dean (Hecla Mining Company)
|
|
|
| Completion: June 2003 |
|
Design, procure and manufacture new crushing plant for gold recovery. Consisted of chain feeder, jaw crusher, cone crusher, screen plant, conveyors, stackers and electrical generator van. |
| Owner: Martin Marietta Aggregates, Cedar Rapids, IA |
|
Manager: Bruce Hanson
|
|
|
| Completion: February 2004 |
|
Design, procure, manufacture and install new sand wash plant. Consisting of new screen tower support structure, screen feed conveyor, chutes, hoppers and water lines. Installation also included concrete work, underground trenching, and poly pipe welding. |
| Owner: M-Bar-D Railcar - Ardoch, ND |
|
Manager: Bill Pladson
|
|
|
| Completion: August 2005 |
|
Design, procure, manufacture and install 1600TPH railcar unloading & truck loadout system for coal. Consisting of (4) railcar unloading hoppers with grizzly, (4) 42"x90' unloading conveyors, 60"x170' gathering conveyor, 60"x170' radial stacker and 48"x290' reclaim system |
| Owner: Thompson - McCully Company, Bellville, Michigan |
|
Manager: Charles McGee
|
|
|
| Completion: 2000, March |
|
Design, procure and manufacture (4) skid mounted screen plants, portable jaw plant and portable screen plant. Consisting of (3) 6'x20' JCI screens, (2) 7'x20' JCI screens, 2148 Pioneer jaw crusher, 48"x22' vibrating grizzly feeder, (4) skid frames, (2) portable chassis, water manifolds & spray bars, discharge conveyors |
| Owner: Smyth Mines, L.L.P - Uvalde, Texas |
|
Manager: John Blades
|
|
|
| Completion: 2000, June |
|
Design, procure, manufacture and install 500 TPH rock asphalt crushing equipment, mixing & blending plant and oil system. Consisting of primary jaw crusher, secondary & tertiary crushers,secondary & tertiary screens, conveyors, stackers, generators, blending plant, oil system, pug mill, and truck load out system |
| Owner: Hardrives, Inc., St. Cloud, Minnesota |
|
Manager: Virgil Dreygens
|
|
|
| Completion: 1999, May |
|
Design and manufacture closed circuit plant and portable washplant. Consisting of RC54II El-Jay crusher, (2) 6'x20' El-Jay screen stwin 36"x25' McClanahan screw, water manifold & spray bars,on plant conveyors |
| Owner: Premier Aggregates, Virginia, Minnesota |
|
Manager: Mike Skubic
|
|
|
| Completion: 1999, July |
|
Design and manufacture closed circuit plant and screen plant. Consisting of 1400LS JCI crusher, (2) 6'x20' JCI screens, (2) portable chassis, and on plant conveyors |
| Owner: Southwest Rock Products, Gilbert, Arizona |
|
Manager: Chris Reinesch
|
|
|
| Completion: 1999, August |
|
Design, manufacture and install stationary wash plant. Consisting of log washer, (2) twin sand screws, (2) coarse material washers,5'x16' wash screen, sand pumps, generator, conveyors, stackers |
| Owner: Thompson - McCully Company, Bellville, Michigan |
|
Manager: Charles McGee
|
|
|
| Completion: 1998, September |
|
Design, procure and manufacture (3) portable crushing & screening plants. Consisting of 2148 Pioneer jaw crusher, RC54II El-Jay conecrusher, (2) 7'x20' El-Jay screens, 48" x 22' vibrating grizzly feeder |
| Owner: Alta Gold Company, Henderson, Nevada |
|
Manager: Robert Pratt / Gary Cummings
|
|
|
| Completion: 1998, September |
|
Design, procure, manufacture and install 500 tph gold crushing equipment and leach pad conveying systems. Consisting of primary & secondary crushers, screening plant, reclaim tunnels,stacker, lime silo, agglomerator, 36" x 1200' overland conveyor,(14) 36'x 85' "grasshopper" conveyors, 36"x140' "extender" stacker |
| Owner: Mineria Y Barrendcion, Morelia, Michocan, Mexico |
|
Manager: Carlos Aguilar Garcia
|
|
|
| Completion: 1998, October |
|
Design and install complete crushing operation for aggregate products. Consisting of primary jaw crusher, secondary & tertiary cone crushers, twin screening plant, generator, conveyors,stackers |
| Owner: Camas Minndak, Inc., Moorhead, Minnesota |
|
Manager: Dean Beilke
|
|
|
| Completion: 1998, April |
|
Design, procurte, manufacture and install wash plant renovation Consisting of mounting 6'x20' screen on frame with chutes and hopper and new water pipe lines and spray deflectors, mount Barmac crusher on frame and rework chutes and stairways, build new discharge chutes off wet screen with by-pass gate |
| Owner: Itex, Division of IRM, L.P., Port Newark, New Jersey |
|
Manager: Rick Redle
|
|
|
| Completion: 1997, May |
|
Design, procure and manufacture hopper & conveyor system. Consisting of 42" x 50' single chain apron feeder with vibrating grizzly, 36" x 225' overland conveyor, 36" x 130' stacker |
| Owner: Geomaque de Mexico, Estacion Llano, Sonora, Mexico |
|
Manager: Mike Carter
|
|
|
| Completion: 1997, July |
|
Design, procure, manufacture and install overland conveyor system and pad stacker. Consisting of 42" x 110' overland conveyor, (18)42" x 85' "grasshopper" conveyors, hydraulic power track assembly designed to fit existing stacker |
| Owner: Barrick Goldstrike Mines, Inc., Carlin, Nevada |
|
Manager: John Breen (Barrick), Kyaw Win & Bill Shaber (Dynatec Mining)
|
|
|
| Completion: 1996, July |
|
Detail, procure, and manufacture 500 TPH crushing station with support structures, chutework, walkways, overhead crane, crusher discharge conveyor, bin collecting conveyor |
| Owner: Geomaque de Mexico, Estacion Llano, Sonora, Mexico |
|
Manager: Mike Carter
|
|
|
| Completion: 1996, July |
|
Design, procure, manufacture and install 800 TPH gold crushing plant renovation. Consisting of 4265 primary gyratory crusher,2400 secondary gyratory crusher, (3) 500 tertiary cone crushers, primary scalper, triple 6'x16' finishing screen plant, lime silo, stacker |
|
|
|

13'
Portable Air Separator

10'
x 70' Portable Truck Scale

Overland
Telescoping Conveyor
36" x 225'

Portable
Generator Van

5-Pak
Conveyor Systems
|